Renovation Pictures
Camp New Hope
on the banks of the New River.........
the new kitchen is to paint it the same color as the rest of the lodge..
The new tile floor is being laid in the kitchen.  This pattern makes the
room look bigger.
Insulation is in place in the new kitchen and next up is the bead-board
walls and ceiling.
The roof is done and the outside walls are up, next is the trim to match the
existing outside walls
Here's a shot of the new Bathroom in the corner where the new stacked
washer and dryer will be..
The new master bedroom now has it's 40" handicap accessible door
installed.
Walter, one of our local volunteers, working on the finish trim on the
outside of the new kitchen.
Friday, March 25th
Renovation Pictures by Page:
Nearly all of the outside work is done on the new kitchen....