Renovation Pictures
Camp New Hope
on the banks of the New River.........
The view from the back of the lodge and you can see that the roof is now
on the new kitchen.
The door and windows are in place, only thing left to do outside is the tin
roof and siding.
The frame of the new Handicapped accessible shower going into the new
bathroom.
The new bathroom is all framed in and ready for sheetrock.....
A new overhead soffet marks where the old wall was separating two
bedrooms, now there is a new master bedroom...
Trim is in place and ready for stain in the new master bedroom...
Tony is a volunteer from Asheville, NC......He is here working on the
Renovation Pictures by Page:
|